longstory

San Pedro Bay: Los Angeles and Long Beach Ports development in 2020

In 2020 Covid-19 posed a challenge to containers crossing L.A.'s twins ports

longstory

Genoa: the worksite that won’t stop for Coronavirus

Genoa’s new bridge has now reached the length of one kilometre (0.62 miles), since work has continued despite the Covid-19 thanks to strict safety measures.

longstory

Keeping worksites open in a deserted city: New York’s challenge

While New York copes with its lockdown, worksites remain open

While New York copes with its lockdown, worksites remain open

">
longstory

Cina, un nuovo maxi collegamento sul fiume Pearl